suecasa
Addicted Newbie
- Joined
- Nov 25, 2012
- Messages
- 131
- Reaction score
- 39
Hey there experts ... need some advice ...
I'm 4 days into a Coastal White in primary ... SG is at 1.030 today (start was 1.088). I'm trying to keep the room warm, but it's occasionally dropping the temp into the 60s since its been outside temps in the negatives ...
so that may effect my timeframes which I didn't take into account when starting this batch...
my problem is I leave for a 3 week trip in 10 days ... so where should I leave the process? Move to secondary when it reaches 1.010 and leave it there for possibly 4 weeks if it doesnt go dry before we leave?
If it does manage to reach dry ... should i just rack and airlock? add anything? try to degass?
Guess I'm just curious about which stages (other than long aging of course) will be a problem if they are allowed to go longer than necessary??
I'm 4 days into a Coastal White in primary ... SG is at 1.030 today (start was 1.088). I'm trying to keep the room warm, but it's occasionally dropping the temp into the 60s since its been outside temps in the negatives ...
so that may effect my timeframes which I didn't take into account when starting this batch...
my problem is I leave for a 3 week trip in 10 days ... so where should I leave the process? Move to secondary when it reaches 1.010 and leave it there for possibly 4 weeks if it doesnt go dry before we leave?
If it does manage to reach dry ... should i just rack and airlock? add anything? try to degass?
Guess I'm just curious about which stages (other than long aging of course) will be a problem if they are allowed to go longer than necessary??