Aggie300zx
Junior
- Joined
- Aug 18, 2010
- Messages
- 5
- Reaction score
- 0
I started the La Bodega port kit five days ago. I waited until 24 hours in to add the raisins. I checked the SG today (day 5) and it was at 1.000. The instructions indicate waiting until 1.040-1.050 before racking. How long does this kit usually take to hit the mark for the initial racking? The instructions do not indicate a time range. Thanks!